Shopping Cart

No products in the cart.

ACI 351.5M-15 PDF

$24.00

Specification for Installation of Epoxy Grout between Foundations and Equipment Bases (Metric)

American Concrete Institute , 09/01/2015

Category:

ACI 351.5M-15 PDF

This specification covers minimum requirements for epoxy grouting between foundations and equipment bases. Included are requirements for materials, placement, and quality control.

ACI 351.5M-15 pdf
ACI 351.5M-15 PDF

$24.00